References for ICA/communications engineering

back to overview

Revamp_VST_Sayda

1994 - 2004 Sayda compressor station revamp

A number of revamp projects for plant and equipment has been prepared and implemented at the Sayda conveyor compressor station of VNG - Verbundnetz Gas AG since 1994 to date:

1994:

1995/96:

1996:
installation of a gas drying plant, two-stringrun, for 500,000 standard m3/hr. each,
replacement of heating and ventilation equipment in the turbine workshop,
replacement of the suction and outgoing air sections at the gas turbines of the CKD compressor units, ...