A number of revamp projects for plant and equipment has been prepared and implemented at the Sayda conveyor compressor station of VNG - Verbundnetz Gas AG since 1994 to date:
1994:
1995/96:
1996:
installation of a gas drying plant, two-stringrun, for 500,000 standard m3/hr. each, replacement of heating and ventilation equipment in the turbine workshop, replacement of the suction and outgoing air sections at the gas turbines of the CKD compressor units, ...